Zi Group

Water Treatment · Surface Water Treatment Plant · SWTP · Payra Port Authority · Water Infrastructure · Kalapara · Patuakhali · Port Infrastructure

Surface Water Treatment Plant for Payra Port Authority

Project Overview

Surface Water Treatment Plant for Payra Port Authority

Project Description

The Surface Water Treatment Plant for Payra Port Authority was developed to strengthen water supply infrastructure in Kalapara, Patuakhali, and support the operational requirements of one of Bangladesh's important port development areas.

The project was undertaken for the Payra Port Authority and involved the construction of a modern Surface Water Treatment Plant (SWTP) with a capacity of 250,000 liters per hour. The project covered the design, development, construction and implementation of an integrated surface water treatment facility capable of supporting reliable access to treated water.

Completed between October 2015 and November 2016, the project represents an important contribution to the development of sustainable water infrastructure in the Kalapara area.

High-Capacity Surface Water Treatment Solution

With a treatment capacity of 250,000 liters per hour, the Surface Water Treatment Plant was designed to address significant water supply requirements through a dedicated and reliable treatment system.

The facility utilizes surface water as its primary source and incorporates appropriate water treatment infrastructure to process raw water and support the production of treated water for the project area.

The development of a dedicated treatment plant helps strengthen local water infrastructure while reducing dependence on alternative water sources that may be insufficient to meet growing demand.

Integrated Engineering and Project Execution

The project encompassed the design, development and construction of the Surface Water Treatment Plant, combining water treatment engineering with effective project management and infrastructure development.

The facility was developed with a focus on operational efficiency, reliability and the requirements of a major infrastructure client. From planning and construction to implementation and commissioning, the project required coordinated technical expertise to deliver a high-capacity water treatment solution within the planned project timeline.

Supporting Port and Regional Development

Reliable access to treated water is essential for infrastructure development, operational activities and the sustainable growth of surrounding communities.

The Surface Water Treatment Plant contributes to strengthening the water infrastructure supporting the broader development activities associated with the Payra Port area. By establishing significant treatment capacity in Kalapara, the project supports the long-term infrastructure requirements of the region.

The development of modern water treatment infrastructure also contributes to public health and sustainable development by improving the capacity to manage and treat available water resources.

Zi Group's Commitment to Sustainable Water Infrastructure

Zi Group is proud to be associated with important infrastructure projects that contribute to Bangladesh's sustainable development and the expansion of essential public and industrial facilities.

Through expertise in water treatment, surface water treatment systems, environmental infrastructure, engineering and integrated project solutions, Zi Group continues to support the development of reliable and sustainable infrastructure across Bangladesh.

The successful implementation of the Surface Water Treatment Plant for Payra Port Authority demonstrates the ability to deliver large-scale water infrastructure solutions that address critical water supply requirements and contribute to long-term regional development.

Key Highlights

  • 250
  • 000 Liters per Hour Treatment Capacity
  • High-Capacity Surface Water Treatment Plant
  • Modern Water Treatment Infrastructure
  • Design and Construction of SWTP
  • Integrated Engineering Solution
  • Reliable Treated Water Supply
  • Payra Port Infrastructure Support
  • Client Payra Port Authority
  • Project Location Kalapara Patuakhali
  • Sustainable Water Infrastructure
  • Project Completed Successfully